Visit us at Rebuild Exhibition
Visit us at Pavilion 10, Stand D416, from the 21st to 23rd of September in Madrid-IFEMA
You may also like
Publication of the 2025 Corporate Social Responsibility Report
GRES ARAGÓN-FAVEKER has published its fourth Corporate Social Responsibility Report, presenting the company’s performance during 2025. The report is available on its website and covers all the plants that make up the GRES ARAGÓN Group in Alcañiz and Alcorisa.
Technical Seminar on Fire Prevention in Ventilated Façades
The technical seminar organized by Faveker focused on fire prevention in ventilated façades, using the Campanar building in Valencia as a reference case. Through this project, construction solutions based on high-performance ceramic systems were addressed, highlighting their contribution to passive safety, efficiency, and durability in building design.
Faveker Supplies the New Ventilated Ceramic Façade for the Renovation of the Campanar Building
The renovation of the Campanar Building in Valencia includes the participation of Faveker, which has supplied a new ventilated ceramic façade developed with vitrified extruded porcelain with an A1 classification. Through an integrated system focused on passive safety, the company reinforces its commitment to construction solutions that combine innovation, energy efficiency, and maximum fire safety.
